Our Projects

  • Mooring Analysis
  • Naval Architect
  • Structural Analysis
  • Loadout
  • Pipeline
  • FlexStim
  • Marine & Offshore Consultancy Project
  • Vessel Suitability
  • IMCA & OVID Surveys
  • On-hire/Off-hire Surveys
  • Bunker Survey
  • Safety Project
  • Floating Production Services

Marine Warranty Survey Projects

  • Provision of Marine Warranty Surveyor for Infilling Project
  • SSXT Transportation and Lifting Engineering Services for TSB Phase 2
  • Provision of MWS for Transportation & Installation of Mooring Systems, Flexible Flowline and Export Floating Hose for FPSO MTC Ledang at Ophir Field.
  • Marine Assurance & Engineering Services
  • Provision of Independent Marine Warranty Surveyor Services
  • Marine Warranty Survey Services For ConocoPhillips (Grissik) Ltd. & Medco E&P Natuna Ltd. (Formerly ConocoPhillips Indonesia Inc. Ltd.)
  • Tangguh Expansion Project – Lng Epc Marine Warranty Survey
  • Provision of Mws for Fso Bergading Transportation & Installation
  • Kontrak Marine Inspection Selama 12 Bulan (365 Hari Kalender)
  • Ruby Field Development Project – Installation of Marine Navigation Buoy and Mooring Buoy
  • Provision of Marine Warranty Survey Services for Bukit Tua Development Project, Ketapang Psc, East Java, Indonesia (2nd Contract)
  • Provision of Marine Inspection and Assurance Services for KRA South Project
  • Bukit Tua Development Project / Remediation Works of BTJT-A Platform
  • MWS Services for Load Out, Transportation & Installation of Continuous Barge Unloader (CBU)
  • Provision of Marine QA QC and Vessel Inspector Services Natuna Sea Block “A”
  • Provision of Conceptual Study for FPSO Dry Docking
  • Barcelona’ On Load and Transportation on Heavy Lift Vessel
  • Marine Warranty Survey Services for Bukit Tua Development Project, Ketapang PSC, East Java, Indonesia
  • Provision of Marine Warranty Survey Call-Out Services
  • Marine Warranty Survey Work
  • Provision of Marine Inspection Survey Services
  • MWS Services for Load Out Anoa Phase 4
  • Ke-38b, Ke-39 and Ke-54 Deck and Jacket Fabrication Project
  • Global Process System – West Desaru MOPU Project
  • Cendor Phase 2 & West Desaru Field Development Project
  • Ke-40 Deck Refurbishment and Jacket Fabrication Project
  • SPM 3 Replacement Project
  • Export Hose Investigation
  • Marine Warranty Survey Services
  • Marine Consultancy Services