Here are some of our previous signature projects:
- MWS for Bukit Tua Development Project (2016 completion)
- Abadi FLNG Marine Vessel Capability Study (2016)
- Pasca LPG FSO Concept Study (2016)
- Flexible Duplex Flowline Installation Analysis- Tanjong Baram Development (2015)
- Shell Malaysia Hook Up & Commissioning (Mooring Analysis Assurance of Accommodation Work Barge) (2015 and ongoing)
- FPSO ANOA Conceptual Dry-Dock Study (2013)
- Structural Analysis of Modified “A” Frame (2013)
- Schlumberger Flex Stem Deck Strength Analysis Review. (2013)
- Gajah Baru Central Processing Platform Load Out, Transportation and Installation (2012)
- MWS for New-built Yacht Hotel ‘Sunborn Barcelona’ (Largest ship/Luxury Floating Hotel ever built in Malaysia and the first of its kind in South East Asia)
- MWS for West Desaru Field Development Project
- MWS for Cendor Phase 2 Field Development Project