![Daya 2](https://ime-consultants.com/wp-content/uploads/2016/06/Daya-2.png)
Flexible Duplex Flowline Installation Analysis- Tanjong Baram Development (2015)
Installation analysis for a 5.5” flexible flowline between West Lutong Drilling Platform-A (WLDP-A) and Tanjong Baram Well Head Platform (TB WHP). The analysis included:
- Pull-in at WLDPA.
- Static lay.
- Dynamic lay.
- Laying in curves.
- Laydown.
- Pull-in at TB WHP.
![Daya 1](https://ime-consultants.com/wp-content/uploads/2016/06/Daya-1.png)
![Daya 3](https://ime-consultants.com/wp-content/uploads/2016/06/Daya-3.png)