Gajah Baru Central Processing Platform Load Out, Transportation and Installation (2012)
[su_list icon="icon: crosshairs" icon_color="#fff"]
-
Attend the Contractor’s fabricator and monitor the load out of the CPP jacket and topsides
-
Review and comment on all load out procedures
-
Provide surveillance that these procedures are implemented and sign off the check sheets /
-
handover documents
-
Interface with the MWS to ensure that all his requirements are implemented
-
Provide surveillance of the cargo barge preparation and installation of all sea fastening
-
Review all tug and barge documentation at site and ensure completeness and validity
-
Ensure that all HSE procedures are implementing and that the work is carried out in a safe manner.
-
Review of all load out, transportation and installation procedures.
-
Offshore surveillance to ensure that work was carried out safely correctly